News of 2025
Receipt of Order from Kanazawa City for "FY2024 Rehabilitation of Biosolid Joint Treatment Facility No. 1 Incinerator"
Overview of business
1. Business name
FY2024 Rehabilitation of Biosolid Joint Treatment Facility No. 1 Incinerator
2. Contractee
Kanazawa City Enterprise Bureau
3. Contract date
December 27, 2024
4. Tendering method
Public offering-based proposal method
5. Business method
DB (Design Build: Lump-sum design-build order) method
6. Location
Biosolid Joint Treatment Facility (Johoku Water Quality Control Center), Asano-Honcho, Kanazawa City (On the Premises)
7. Contractor
Joint enterprise for specified construction business formed by METAWATER Co., Ltd. and Tsukishima Aqua Solution Co., Ltd.
8. Business overview
Design, fabrication,
and installation of a full set of supercharged fluidized bed combustion system (sludge incineration 60 t-WS/day × 1 unit), auxiliary equipment, and electrical equipment
9. Business period
From December 27, 2024, to March 16, 2029