News of 2025

News Release
March 31, 2025

Receipt of Order from Kanazawa City for "FY2024 Rehabilitation of Biosolid Joint Treatment Facility No. 1 Incinerator"

Overview of business

1. Business name

FY2024 Rehabilitation of Biosolid Joint Treatment Facility No. 1 Incinerator

2. Contractee

Kanazawa City Enterprise Bureau

3. Contract date

December 27, 2024

4. Tendering method

Public offering-based proposal method

5. Business method

DB (Design Build: Lump-sum design-build order) method

6. Location

Biosolid Joint Treatment Facility (Johoku Water Quality Control Center), Asano-Honcho, Kanazawa City (On the Premises)

7. Contractor

Joint enterprise for specified construction business formed by METAWATER Co., Ltd. and Tsukishima Aqua Solution Co., Ltd.

8. Business overview

Design, fabrication,
and installation of a full set of supercharged fluidized bed combustion system (sludge incineration 60 t-WS/day × 1 unit), auxiliary equipment, and electrical equipment

9. Business period

From December 27, 2024, to March 16, 2029