News of 2021

News Release
October 26, 2021

Receipt of Order from Ibaraki for "(Obligation) Southern Ibaraki rehabilitation Prefecture unit No. 03-30-003-6-002 Ozone catalytic tank machinery construction"

The advanced oxidation process (AOP) system installed in this construction work will be a treatment technology that combines ozone treatment and hydrogen peroxide, as a new solution for the mold smell of the drinking water source. This will be the first application to water treatment in Japan. The appropriate control of the ozone and hydrogen peroxide introduction will realize the decomposition of the high concentration mold smell, an improvement to the treatment efficiency in the low water temperature season, the suppression of the byproduct bromic acid generation, and a reduction of the burden on the activated carbon in later stage processing.

verview of construction

1. Construction name

(Obligation) Southern Ibaraki rehabilitation Prefecture unit No. 03-30-003-6-002 Ozone catalytic tank machinery construction

2. Contractee

Ibaraki Prefectural Government Public Enterprise Bureau

3. Contract date

September 30, 2021

4. Tendering method

Open tendering method (Comprehensive evaluation method)

5. Location

Kasumigaura water treatment plant (2972, Ooiwata, Tsuchiura City, Ibaraki Prefecture)

6. Contract amount

2,359,500,000 yen (including tax)

7. Contractor

METAWATER Co., Ltd.

8. Business overview

Ozone catalytic tank machinery construction  Full set
Ozone generators  Three units
Air source apparatus  Three units
Cooling water devices  Three units
Waste ozone treatment device  Full set
Hydrogen peroxide injection equipment  Full set
Advanced oxidation process (AOP) equipment control device  Full set

9. Project period

October 1, 2021 to March 15, 2024